Follow up the same day you deliver the estimate, then at day 2, day 7, day 14, and day 21. At one high performing firm, 97 percent of the jobs they sold closed within a 21 day window [3]. The industry average close rate is about 33% [1], and structured follow up is one of the few things you control after the proposal is in the homeowner's hands.
By Joe Petocz, EstimateElite. Updated .
What does the close rate data say about follow up?
The average close rate in remodeling is about 33% 1. Two out of every three proposals you deliver go unsigned. Among firms with a dedicated sales team, the conversion rate on qualified leads averages 40.7% 5. Qualified in that context means the salesperson met the prospect face to face or walked through ballpark pricing. The gap between 33% and 40.7% likely reflects better qualification up front and consistent contact afterward.
You cannot lower the price after the proposal is delivered. You cannot make the homeowner's spouse agree. But you can be the contractor who keeps showing up with something useful while the other two bidders disappear.
At one high performing window and door company, 97 percent of the jobs they sold closed within a 21 day window 3. Your timeline may vary, but the pattern holds: after about three weeks most homeowners have either signed with someone, shelved the project, or moved on. A follow up plan that stretches well beyond three weeks is usually chasing a decision that was already made.
What is the right follow up schedule?
Five contacts across 21 days. Each one has a job to do. Checking in is not a job.
| When | Channel | What to say | Purpose |
|---|---|---|---|
| Same day | Phone or in person | Walk through the proposal line by line. Name the three largest costs. Ask if anything in the estimate surprises them. | Catches sticker shock while you are still there to explain it. Contact the lead today, not tomorrow [4]. |
| Day 2 | Text | Short message asking if anything came up after reviewing the numbers. Offer to explain any line item. | Low effort to reply. Shows you are available without asking for a decision. |
| Day 7 | Phone call | Ask where they stand. If they are comparing proposals, ask what matters most to them besides price. | By day 7 they have likely seen competing bids. This call surfaces objections you can still address. |
| Day 14 | Send a photo of a similar finished project, a note about current material lead times, or your next available start date. | Provides value without requesting anything. Keeps you in front of them while competitors go quiet. | |
| Day 21 | Text or email | One final message. Let them know you are around if the project restarts. No ask. | Ends the sequence respectfully. The homeowner knows they can come back. |
Does the follow up change based on how they found you?
A close rate above 50% is expected for referral work and is not a pricing problem 7. The homeowner already heard from someone they trust that you do good work at a fair price. Your follow up with a referral can be shorter. The day 2 text and day 7 call are usually enough. If a referred homeowner stops responding by day 14, something changed and a direct phone call is the right move.
Cold inquiries from a website or ad are different. The homeowner does not know you yet. They are comparing you against two or three other contractors they also found online. The full five contact schedule matters here because repeated useful contact is how you earn trust when you have no shared connection doing that work for you.
Firms that convert 40.7% of qualified leads on average 5 are working with prospects the salesperson has already met face to face or walked through ballpark pricing with. When you confirm scope, budget range, timeline, and who makes the spending decision before you drive out, every follow up message has context. You are not guessing whether the price scared them. You already know it was in their range.
EstimateElite shows you every homeowner's budget before you pick up the phone. See how the setup works
What do you actually say at each stage?
Generic messages get ignored. Each contact below gives the homeowner a reason to respond. Adjust the details for your company and project.
Day 0 (phone or in person, before leaving the site visit): 'I want to walk through the numbers before I go. The three biggest items on this estimate are [name them]. Does anything here need more explanation? Take your time with it and I will follow up in a couple of days.'
Day 2 (text): 'Hi [name], this is [your name] from [company]. Anything come up after looking over the estimate? Happy to walk through any line item.'
Day 7 (phone call): 'Hi [name], this is [your name]. Wanted to check in on the project. Have you had a chance to compare proposals, or are you still collecting numbers?' If they say still deciding, ask what is weighing on them most. If they mention a lower bid from someone else, ask what scope it covers. The gap between two bids is almost always in what was left out.
Day 14 (email, subject line: Quick note on your project): 'Hi [name], wanted to pass along a photo of a similar project we wrapped up recently. [Attach photo.] Also, [material] lead times are running about [X] weeks right now. If the project is still moving, locking in materials sooner keeps your start date on track.'
Day 21 (text or email): 'Hi [name], following up one last time on your project. If it comes back around, I am here. No pressure either way.' Keep the final message short. Do not explain, bargain, or apologize.
Notice that every message either asks a specific question or delivers something the homeowner can use. A message that says 'just checking in' gives them nothing to respond to. If you cannot think of a reason for the contact beyond checking a box, skip that touch and move to the next one.
When do you stop following up?
Five contacts across 21 days is enough for a standard remodeling estimate. If you have sent all five and the homeowner has not replied to any of them, the decision has been made. Sending a sixth tells them you are not reading the room.
The rule changes based on what the homeowner has told you.
| Situation | What to do |
|---|---|
| No reply to any of the five contacts | Stop. They either signed with someone else or shelved the project. |
| Replied at least once but asked for more time | Give them the window they asked for. One more contact after it closes. |
| Told you they chose another contractor | Stop immediately. Thank them and move on. |
| Said they are waiting on financing, permits, or a family decision and that timeline has now passed | One more contact is reasonable. |
| Engaged throughout but has not committed | Ask directly what is holding things up. If they cannot name the obstacle, the project is probably on hold. |
What is one recovered estimate worth?
Each estimate takes about 10 hours from the first phone call through the delivered proposal 2. At $39.74 per hour for residential building workers 6, that is roughly $400 in labor per sales attempt.
At a 33% close rate 1, two thirds of those attempts end without a signed contract. The labor behind each lost estimate is spent whether or not anybody followed up afterward.
The follow up schedule above costs about 30 minutes of your time per prospect spread across three weeks. Two texts, one phone call, one email, and the walkthrough you should be doing on day zero anyway. That is a half hour protecting a $400 investment 26. Even one recovered estimate per quarter pays for the time many times over.
A close ratio below 15% is a bad close ratio, and above 50% on non referral work usually means you are not charging enough 7. Between those two markers, a structured follow up sequence is the simplest lever you have. If you are below 15%, the problem is usually upstream of follow up: unqualified prospects, late proposals, or prices that do not match the market.
Know who you are following up with before you drive out
When homeowners answer a few screening questions on your website, you see their budget, scope, and timeline before the site visit. Every follow up after the estimate starts with information instead of guesswork.
Common questions.
Rotate between all three. Text gets the fastest response. Phone returns the most useful information. Email is the right pick when you need to attach a photo, a document, or a scheduling link. Repeating the same channel on consecutive contacts makes you easy to tune out.
Sources
- What's the Real Cost of Landing the Job?, Pro Remodeler
- What's the Real Cost of Landing the Job?, Pro Remodeler
- How Home Improvement Companies Sell Today, Pro Remodeler
- How to Increase Your Odds of Closing Remodeling Sales, Pro Remodeler
- Target Practice, Pro Remodeler
- Wage Growth for Residential Building Workers Continues to Cool, NAHB Eye on Housing
- Getting the Right Close Ratio for Your Remodeling Sales, Pro Remodeler