What One Wasted Estimate Actually Costs Your Remodeling Company
Each estimate you run and lose costs roughly $397 in labor at average residential building wages. At a 33% close rate, a company landing 12 jobs per year runs about 24 estimates that go nowhere, adding up to $9,700 in unbilled time.
By Joe Petocz, EstimateElite. Updated .
How 10 hours disappear on one estimate
The average total time to take one prospect from first phone call to delivered proposal is 10 hours 1. That covers the initial conversation, scheduling, the drive, walking the site, measuring, pricing out materials and subs, and assembling and presenting the proposal.
Here is how those hours typically break down.
| Task | Hours |
|---|---|
| Phone call, scheduling, and intake | 0.5 |
| Drive to the site and back | 1 |
| Site walkthrough and measurements | 1 |
| Cost takeoff, supplier and sub calls | 4 |
| Proposal writing and presentation | 3.5 |
| Total | 10 |
What those hours cost in dollars
Average hourly earnings for residential building workers reached $39.74 as of June 2026 2. That is the Bureau of Labor Statistics figure for the residential building sector. It covers a range of workers in the trade. If the person running your estimates is the owner or a project manager, their actual hourly cost is higher.
At that rate, one estimate costs $397 in labor 12. That is the bill whether the homeowner signs or never calls back.
Then there is the vehicle. The IRS standard mileage rate for 2026 is 72.5 cents per mile for business use 3. That rate accounts for gas, depreciation, insurance, tires, and maintenance. Every round trip to a job site adds to the real cost of the estimate, win or lose.
What a full year of wasted estimates adds up to
NAHB data shows the median dedicated remodeler completed 12 jobs over $10,000 in 2025 5. The average close rate in remodeling is somewhere around 33% 4. At that rate, closing 12 jobs requires running about 36 estimates over the course of a year. The remaining 24 do not result in a signed contract.
Example. You run a residential remodeling company and closed 12 jobs last year. Your close rate sits at about 33%. That puts your total estimate count near 36 for the year. The 24 that did not close consumed 240 hours of your time and cost $9,700 in labor 1245. Add 72.5 cents per mile for every round trip to those 24 sites 3 and the real number climbs higher.
That is 240 hours. Six full work weeks of your year. Spent producing proposals that nobody signed.
What $9,700 means on a 6.3% net margin
The average net profit margin for remodelers was 6.3% in 2024 6. That is what remains after materials, labor, subs, overhead, insurance, and the owner's pay are covered.
To earn back the $9,700 you spent on wasted estimates, you would need to close $154,000 in additional revenue 12456. That is the volume of work required to generate $9,700 in actual net profit at a 6.3% margin.
This does not mean you should stop giving estimates. It means each one you avoid running on a homeowner who was never going to sign saves you $397 and a day you will not get back.
Which estimates are most likely to go nowhere
Not every lost estimate was avoidable. Sometimes the homeowner liked your work but went with a lower bid. Sometimes the project got postponed for reasons nobody could predict. Those are normal losses at a 33% close rate 4.
But some estimates are predictable losses before you leave the shop. These patterns show up on the first phone call.
- The property is far outside your service area and the project is not large enough to justify the drive.
- The scope is not something your company does. A bath remodeler driving out to price a deck addition is wasting the day.
- There is no timeline. The homeowner says sometime next year or just collecting ideas. They are researching, not hiring.
- The decision maker is not involved. One person called but someone else controls the spending, and they have not discussed numbers yet.
- The stated budget is a small fraction of what the work actually costs, and the caller is not open to hearing the real range.
- The homeowner will not answer basic questions about scope, location, or when they want to start.
What to find out before you commit the day
Six questions on the first phone call cover the biggest disqualifiers: address, project scope, timeline, who makes the decision, budget range, and how they found you. The whole call takes five minutes.
Address tells you the drive time and whether the job is in your territory. Scope tells you whether it is your kind of work. Timeline separates active buyers from people gathering ideas. The decision maker question prevents you from presenting a proposal to the wrong person. Budget reveals whether expectations and reality are in the same neighborhood. And the referral source tells you how much trust exists before you start.
Two or more red flags from the same caller is a strong signal. Declining that estimate and putting the time toward a better prospect saves $397 and 10 hours every time you do it 12.
Stop spending 10 hours blind
A screening form on your site shows you the homeowner's project, address, timeline, and budget range before you return the call. You see who fits your company and who does not before you commit the drive.
Common questions.
Some companies charge a design consultation fee and credit it toward the contract if the homeowner signs. This screens out callers who are not serious but can also push away real buyers who are comparing multiple contractors. Whether it works depends on your market and your demand. If you close one in three and each estimate costs $397 in labor, a paid consultation at least offsets the loss on the ones that do not close.
Sources
- What's the Real Cost of Landing the Job?, Pro Remodeler
- Wage Growth for Residential Building Workers Continues to Cool, NAHB Eye on Housing
- IRS Sets 2026 Business Standard Mileage Rate, Internal Revenue Service
- What's the Real Cost of Landing the Job?, Pro Remodeler
- NAHB Remodelers: What the Data Says, NAHB Eye on Housing
- Remodelers Saw Profit Margin Gains in 2024, NAHB Eye on Housing