Ten short steps. Set it up now
Contractor guide

How to Raise Your Prices Without Losing the Clients You Already Have

Raise prices on new bids whenever your costs outpace your last price update. Set the increase to cover the gap in materials, labor and overhead, then tell clients in one sentence what changed and when new pricing starts.

By Joe Petocz, EstimateElite. Updated .

When is it time to raise prices?

If your material costs went up and your prices did not, you already gave yourself a pay cut. Residential building material prices rose 4.4% year over year as of May 2026, the highest rate since January 2023 3. By July builders in the NAHB survey reported material costs up 6.7% over the prior year 4. Those increases hit your bottom line whether you pass them through or not.

The average remodeler spent 70.1% of revenue on cost of sales in 2024 1. If that share climbs because you held prices while costs rose, your gross margin shrinks and overhead eats a bigger piece of what is left. The average remodeler only kept 6.3% net profit after 23.6% went to overhead 1. There is not much room to absorb cost increases without acting.

Review your pricing at least once a year. If you have not updated prices in over twelve months, you are almost certainly behind.

How much should you raise prices?

Start with your actual numbers. Pull your last three completed jobs. Compare what you estimated for materials, labor and subs against what you actually spent. The gap between estimated and actual cost is the minimum your prices need to move.

If you do not track job costs that closely, use the broader benchmarks. Building material prices are up 4.4% to 6.7% year over year depending on the measure 34. Smaller contractors get hit harder. Builders who started 5 or fewer homes in 2025 saw material costs rise 9.1%, while those with 100 or more starts reported only 1.8% 5. If you are a small to midsize remodeler, your increase likely needs to be near the top of that range.

In our pricing data, the direct costs on a 150 sq ft mid range kitchen total $53,361. A 6.7% increase on a job that size is about $3,600. That is real money on a single project. Run a dozen jobs like that in a year and you have given back $43,000 in margin by not raising your price.

What a 6.7% cost increase looks like on real jobs
Job typeCurrent costAfter 6.7% increaseDollar change
150 sq ft kitchen, basic$30,000$32,000$2,000
150 sq ft kitchen, mid range$53,000$57,000$3,600
150 sq ft kitchen, premium$108,000$115,000$7,200
Rounded from our cost data for a 150 sq ft kitchen at basic, mid range and premium finish levels. The 6.7% matches the median material cost increase reported in mid 2026 [4].

What to say to existing clients

One sentence of reason. One sentence of timing. That is it. Long explanations sound like you are asking permission. You are not.

Here is wording you can use: "Starting [date], our pricing on new proposals will reflect an adjustment for increased material and labor costs. Any project we have already signed stays at the agreed price."

Send this 30 to 60 days before the effective date. That gives people who have been thinking about a project a reason to sign now, and it gives you a clean cutoff. Everyone who calls after that date gets the new number.

Do not apologize. Do not say "unfortunately." The homeowner is not surprised that construction costs went up. What they care about is whether you are straightforward about it.

EstimateElite shows you every homeowner's budget before you pick up the phone. See how the setup works

How to handle pushback on new prices

New prospects never saw your old price. Just bid at your new numbers. The mistake contractors make is quoting the old price out of habit, then absorbing the difference on every job for months.

If a prospect says your price is high, that is a scope conversation, not a discount conversation. Show them what is included. Offer to reduce the scope or simplify finishes to fit their budget. Never cut your rate. The rate is built from your costs plus your margin. Discounting it means you are working for less than the job costs you to deliver.

The top 25% of remodeling firms averaged $493,000 in net profit in 2024, an 18.4% net profit margin 2. The bottom 25% ran at a loss 2. The difference is not that the top firms do fancier work. It is that they price to cover their costs and hold that price.

What about contracts already signed?

Honor them. A signed contract is a promise. Raising the price on work you already agreed to destroys trust and can create legal problems depending on your state.

For future contracts, add a material price escalation clause. This protects you on jobs with long lead times where months pass between the signed contract and the material order.

Example clause: "If the documented cost of specified materials increases by more than 5% between the date of this agreement and the date of purchase, the contract price will be adjusted by the difference above that threshold, supported by supplier invoices."

What the numbers look like if you do not raise prices

The average remodeler in 2024 spent 70.1% of revenue on cost of sales, left 23.6% for overhead, and kept 6.3% as net profit 1. That is the starting point.

Now assume your costs go up 6.7% 4 but you hold your prices. Cost of sales jumps from 70.1% to 74.8% of revenue. Gross margin drops from 29.9% to 25.2%. After the same 23.6% overhead, net profit falls from 6.3% to 1.6%. That is the difference between a viable business and barely covering your bills.

The top 25% of remodeling firms averaged $493,000 in net profit 2. At 1.6% you are not in that group. You are closer to the bottom quartile, which ran at a loss. That is the cost of holding your price for one year while costs moved.

A checklist before you raise prices

Run through this before you announce anything.

  • Pull your actual job costs from the last six months and compare them to your estimates.
  • Calculate your current gross margin. The industry average is 29.9% 1. If you are below that, the increase needs to be larger than the cost gap alone.
  • Decide the effective date. Give 30 to 60 days notice for repeat clients.
  • Write the announcement. One sentence of reason, one sentence of timing.
  • Update your estimating templates, proposal software and any price sheets the same day the new pricing takes effect.
  • Add a material escalation clause to your contract template for jobs with long timelines.
  • Review again in six months. Material prices moved 4.4% in just one year 3. Do not wait two years to look again.

Know what each homeowner wants before you quote

When someone fills out your form, see their budget range, room size and finish preferences before you pick up the phone. Price with confidence from the first conversation.

Questions

Common questions.

At least once a year. Review your costs every six months. If materials or labor have moved meaningfully since your last update, adjust before you bid the next job. Building material prices rose 4.4% to 6.7% year over year in 2026 [3][4], so annual reviews are the bare minimum.

Sources

Where EstimateElite fits

  • Pricing from your quotes

    Upload up to five quotes you have sent. The tool reads them and tunes your pricing to match, so homeowners see your number, not a national average.

  • AI assistant

    Ask it in plain words. It builds estimates and takeoffs from plans or photos, writes scopes and change orders, makes pictures, drafts your texts and emails, and moves your leads and calendar for you.

  • EstimateElite vs Handoff

    Handoff writes the estimate after the walkthrough. EstimateElite decides who gets a walkthrough.

  • Estimating software for remodelers, compared

    What each kind of tool does, the products remodelers compare, and where each one stops.