Whole House Remodel Cost: How to Budget by Room, Finish Level, and Phase

The kitchen and two bathrooms form the most expensive part of a whole house remodel. Our 2027 projection puts that scope at $57,125 for a basic finish, $92,914 for modern, and $178,974 for luxury, with flooring, paint, and trim for the rest of the house adding to those totals. Building material prices, excluding energy, were up 3.7% [2], so locking in your scope sooner saves money.

By Joe Petocz, EstimateElite. Updated .

What counts as a whole house remodel?

A whole house remodel means updating every major room and surface in the home: kitchen, all bathrooms, flooring throughout, interior paint, lighting, and trim. It does not mean tearing the house down to the studs. Most whole house remodels keep the existing walls, roof, and foundation and focus on replacing what you see and touch every day.

In new home construction, interior finishes account for 24.1% of total construction costs, the largest single category 1. That covers cabinets, countertops, flooring, drywall, paint, trim, and lighting. A whole house remodel replaces most or all of that interior layer across every room in the home.

There is a wide gap between a cosmetic refresh and a full remodel. A cosmetic refresh means new paint, new light fixtures, and refinished floors. A full remodel means new cabinets, countertops, plumbing fixtures, tile, flooring, and electrical throughout. This guide covers the full version: new everything in the kitchen and bathrooms, new surfaces and fixtures everywhere else.

Get your price in 60 seconds or less

Answer a few questions about your kitchen or bathroom and see a preliminary cost range before you talk to anyone.

Free. Your ZIP, your size, your finishes. No account.

How much do the kitchen and bathrooms cost in 2027?

The kitchen and bathrooms consume the largest share of any whole house budget because they combine expensive materials (cabinets, countertops, tile) with expensive trades (plumbing, electrical, tile installation). Here are our 2027 national projections for the two most common remodel sizes: a 150 square foot kitchen and a 60 square foot bathroom.

If your house has three bathrooms instead of two, add another row at the same finish level. Three bathrooms at the basic tier bring the kitchen plus bathroom total to $70,546. These figures are national averages. Coastal and metro markets run higher.

Kitchen and bathroom 2027 cost projections
RoomBasicModernLuxury
Kitchen (150 sq ft)$30,283$53,898$109,082
Bathroom (60 sq ft)$13,421$19,508$34,946
Kitchen + 2 bathrooms$57,125$92,914$178,974
2027 projections from our pricing engine at national average rates. These are preliminary numbers. A contractor's quote will reflect your specific layout, finishes, and local labor market.

What does the rest of the house add?

After the kitchen and bathrooms, the remaining scope covers flooring, paint, trim, baseboard, lighting, and doors throughout bedrooms, hallways, living areas, and dining rooms. This work costs less per square foot than kitchen or bathroom work because it skips plumbing, countertops, and custom cabinetry. But it covers a much larger area.

For a 2,000 square foot house where the kitchen and two bathrooms account for roughly 270 square feet, the remaining 1,700 plus square feet all need new flooring, paint, and baseboard at a minimum. The material choices you make here drive the price more than labor does. Solid hardwood costs several times what laminate does, and that difference multiplied across 1,700 square feet is significant.

The fastest way to estimate this portion: price the kitchen and bathrooms using the table above, then ask your contractor to quote flooring, paint, and trim for the remaining rooms separately. Those trades price by the square foot and the bids come back quickly. Having the kitchen and bathroom numbers locked down first gives the contractor a clear reference point for the finish standard you expect throughout.

Should you do it all at once or phase it?

This is the biggest planning decision in a whole house remodel. Doing everything at once is faster, eliminates duplicate setup and mobilization fees, and avoids price increases between phases. Building material prices for residential construction, excluding energy, were up 3.7% as of April 2026, the fastest pace in three years 2. If materials keep climbing, waiting between phases costs real money.

But doing it all at once means either moving out for several months or living in a construction zone with dust, noise, and no working kitchen. It also means financing the full project up front. At the modern tier, that is $92,914 for the kitchen and two bathrooms alone, before common area work.

Phasing spreads the cost and disruption over time. You finish one set of rooms, move back in, and start the next phase when the budget allows. Year over year growth in renovation and repair spending is expected to slow to just 0.5% by mid 2027 3, which means contractor schedules are not overloaded. A slower market gives you more flexibility to space out phases without losing your preferred crew.

Here is a decision rule. If you can finance the full project and have somewhere to stay, do it all at once. You will save on mobilization and avoid material price increases. If you need to spread payments or want to stay in the house, phase it in three stages.

A three phase plan for a 2,000 square foot house

Example: here is how to phase a whole house remodel at the modern finish level for a house with one kitchen and two bathrooms.

Phase 1 covers the kitchen and any whole house systems work. Start with the kitchen because it disrupts daily life the most and involves the heaviest plumbing and electrical scope. If the house needs an electrical panel upgrade, an HVAC replacement, or new water supply lines, do that work now while walls are already open for the kitchen. Kitchen budget at the modern tier: $53,898.

Phase 2 covers both bathrooms. Doing all bathrooms in a single phase means the plumber, tile setter, and fixture supplier mobilize once, not twice. You save on setup costs and get consistent finishes across both rooms. Budget: $19,508 per bathroom at the modern level.

Phase 3 covers flooring, paint, trim, lighting, and doors throughout the rest of the house. This is the least disruptive phase because it involves surface work only, no plumbing or major electrical. You can live in finished rooms while the crew works through the house room by room. Your contractor can quote Phase 3 once the first two phases establish the finish standard.

  • Phase 1: Kitchen and systems. Electrical panel, HVAC, and plumbing upgrades go here because the kitchen walls are already open.
  • Phase 2: All bathrooms in one round. One mobilization for plumbing, one for tile, one for fixtures.
  • Phase 3: Flooring, paint, trim, and lighting for bedrooms, hallways, and living areas. Least disruptive, done room by room.

What is pushing whole house remodel costs in 2027?

Two forces are working against each other. On the material side, prices keep climbing. Residential building material prices, excluding energy, were up 3.7% in April 2026, the fastest annual pace in three years 2. Diesel, asphalt, and lumber all rose, and those cost pressures ripple through every room of a whole house remodel.

On the demand side, the market is cooling. Year over year growth in renovation spending is expected to slow to just 0.5% by the second quarter of 2027 3. Fewer homeowners starting projects means less competition for contractor time. That can translate into shorter wait times and more room to negotiate on scheduling.

The practical takeaway: materials cost more the longer you wait, but labor availability is loosening. If you are phasing the work, lock in material selections and purchase orders early in each phase. Let the softer labor market work in your favor when scheduling your crew.

Checklist before you scope a whole house remodel

Walk through this list before your first contractor meeting. Every item you can answer in advance leads to a tighter quote and fewer change orders during construction.

  • Walk the house room by room and list everything you want to change. If you cannot decide on a room, leave it for a later phase.
  • Check the age of your electrical panel, HVAC system, and water heater. Anything near end of life goes into Phase 1 with the kitchen so you only open walls once.
  • Count the bathrooms you plan to remodel. One bathroom is simpler to phase than three.
  • Set a total budget across all phases, then break it into per phase amounts. The kitchen phase will be the largest single piece.
  • Get quotes for the full scope even if you plan to phase. Comparing a single contract price to the phased total shows you the premium for splitting the work into stages.
  • Talk to your lender early. A HELOC or renovation loan may require a single scope of work, which affects how you structure the phases.
Questions

Common questions.

Usually at once. A single contract avoids duplicate mobilization fees, keeps trades on a continuous schedule, and locks in material prices before they rise. Phasing is better for cash flow and lets you stay in the house during most of the work, but you may pay a small premium for the separate setups.

Get your price in 60 seconds or less

Answer a few questions about your kitchen or bathroom and see a preliminary cost range before you talk to anyone.

Free. Your ZIP, your size, your finishes. No account.

Are you a contractor?

Homeowners reading this page want a number before they call you.

Put this same price tool on your own website with your prices. You see every homeowner's budget before you pick up the phone, so you stop driving out to people who can't afford the job.

See how it works for contractors

Sources

  1. Cost of Constructing a Home in 2024, National Association of Home Builders
  2. Building Material Prices Increase at Fastest Pace in Three Years, National Association of Home Builders
  3. Remodeling Spending Slowdown, National Association of the Remodeling Industry

Keep reading